Building a Granny Flat with Shared Septic System in NSW
In New South Wales, it is possible to build a granny flat on a block of land with a shared septic system, but there are specific requirements and regulations that must be followed.
To comply with NSW building standards, the granny flat must meet certain criteria, including:
– Being separated from the main dwelling by a wall or partition
– Having its own drainage and sewage connection (or being connected to the existing septic system)
– Meeting minimum floor area requirements
It is recommended to consult with local authorities and/or a licensed builder to determine the specific requirements for your site.